Sludge Profile
Completed By :
Facility:
Plant Type:
Permit BOD:
Permit TSS:
Design Flow:
Raw BOD:
Raw TSS:
Actual Flow :
Raw BOD:
Raw TSS:
Eff BOD:
Eff TSS:
Other :
Aeration Basin Capacity (Volume):
#1:
#2:
#3:
MLSS:
#1:
#2:
#3:
MLSSVSS:
#1:
#2:
#3:
Digester Basin Capacity (Volume):
#1:
#2:
#3:
WAS MLSS:
#1:
#2:
#3:
WAS MLSSVSS:
WAS Rate:
Gallons/Day:
Digester:
Anaerobic
Aerobic
TSS:
VSS:
Disposal:
Gallons/Load:
Loads/Month:
Monthly cost per load:
Yearly cost per load:
(average and last 12 months)
Chemical Cost:
Manpower Cost:
(includes pumping, dewatering, hauling, clean-up, and other costs associated with solids handling).
Comments:
Your email address
©2002
Natural Resource Protection, Inc. All Rights Reserved